Blog
5 BIM Trends To Get Into 2020
The AEC industry has always been behind in adopting technological advancements. Hence, these technologies may or may not seem new to you. But they have been around for years and are rising in BIM recently. If you are already using the following, congratulations. You are ahead of the competition. In
8 Best Practices To Improve Design Review Presentations
8 best practices for you to implement during your presentations to achieve productive and effective coordinations that expedite sign off.
8 Ways To Improve Your BIM Collaboration During A Pandemic
Lockdowns are the norm of 2020. Here are 8 ways you can improve your BIM collaboration during a pandemic.
INFR AI announces BIM Track Integration
INFR AI has just announced its integration with BIM Track, allowing for users to bring in models and corresponding issues directly from BIMtrack into INFR AI for interdisciplinary virtual coordination.
Annotations and Callouts
Using Freehand Annotations to callout BIM Model issues discovered during design review in VR and Non-VR Modes.
Case Study: Boustead Projects’ Digital Transformation in Engineering
Established in 1996, Boustead Projects Limited is a leading real estate solutions provider in Singapore, with core engineering expertise in the design-and-build and development of smart eco-sustainable business park and industrial developments for clients including Forbes Fortune 500, S&P 500 and Euronext 100 corporations. When we started doing
Case Study: How China Construction Uses Virtual Reality in Coordination Meetings
We spoke with CCDC’s Head of Corporate VDC/BIM, Rob Sanchez, to understand their transition into BIM & VDC, and how they utilise virtual reality and INFR AI in their processes.
BIM Coordinated Standalone Exportations – INFR AI v0.10.18.0
We are proud to release INFR AI v0.10.18.0; some of the key features in this release include the BIM coordinated standalone (.exe) exportation, Toggle between Imperial and Metric Units of measurements and Superlayers of Autodesk® Revit® and Autodesk® Navisworks®. Standalone (.exe) ExportationInteractive document or takeaway from a coordination
Future of VR in BIM
Building Information Modelling (BIM) has significantly improved the architect, engineer and construction (AEC) industry with data that saves time and money, reduces error and increases productivity. Given that BIM is a powerful process for AEC professionals, it still lacks the ease of collaboration and coordination with stakeholders who are not
How Virtual Reality (VR) Is Improving Architecture
VR improves all phases of architecture from its initial designs and mockups, presenting the project to clients, to design reviews and collaboration with other stakeholders.
Inclusive and Seamless: A New INFR AI Experience With Igloo
A collaboration that was bound to happen. Igloo and INFR AI integration birthing a more immersive BIM presentation and INFR AI experience.
Improve Virtual Design & Construction (VDC) Coordination With INFR AI
BIM has been gaining popularity the past decade and for good reasons. It has revolutionised the AEC industry with its process of creating and managing information throughout the construction lifecycle. BIM is so valuable to the industry that countries such as Singapore, United Kingdom and France have mandated BIM, with
INFR AI Default Navigation Controls
INFR AI softwares use both a combination of mouse and keyboard for smooth and quick navigation, even around large BIM Models.
INFR AI Integrates with BIM 360® to Streamline Collaboration
This is yet another monumental moment here in INFR AI as we announce our new update and introduce our new BIM 360 integration.
Graphics Improvements: INFR AI LITE v0.10.26 Out Now
Improved graphics, meeting links and a whole new organization dashboard
Install SteamVR in An Enterprise or Government Use Environment
We will guide you on how to obtain the necessary licenses and files to use SteamVR software and/or Valve Index hardware in an enterprise or government use environment, i.e. use SteamVR without Steam, Steam accounts, and Internet access.
Introducing Bridge
The core engine of INFR AI now opens to the public!
Introducing Collab Mode: A New Way To Lead Your Meetings
If you’ve used INFR AI’s old Follow Mode, you will realise that this no longer exists. We now have something better for your presentations!
Autodesk®️ Revit®️ Adapted Controls
INFR AI softwares use both a combination of mouse and keyboard for smooth and quick navigation, even around large BIM Models.
The Biggest Challenges Technology Adoption is facing in Construction
Although the adoption of technology in the AEC industry has been going on for the better half of the past decade, many companies are struggling to truly realise its long term benefits and sustainability past the pilot stages.
The Must-Know Terms For Beginner BIM Teams
3DIn BIM, 3D is the BIM model everyone is familiar with. A 3D BIM has graphical and non-graphical information that is shared in a Common Data Environment (CDE). 4D4D BIM has an additional dimension of information for construction sequencing. The scheduling data in 4D BIM creates a visualisation of how
Virtual Design and Construction: All You Need To Know
What does BIM stand for in construction?Building Information Modelling (BIM) is a methodology; a strategic approach that utilises 3D geometric information at its core, while further imbuing these geometries with semantic information. Therefore allowing for intelligent applications which help increase the quality and accuracy of construction planning and management.
What Is Virtual Design And Construction (VDC)?
To put it simply, Virtual Design and Construction (VDC) is the virtual building process of a project before you start the actual construction in real-life. It helps reduce reworks, saves cost and time while improving productivity. BIM vs. VDCBIM and VDC overlap each other but there are a few key
Why Include VR in BIM Execution Plan
IntroductionArchitecture, Engineering & Construction projects have long been hamstrung by delays and escalating costs due to a myriad of unforeseen factors and events during the planning and execution of complex projects. While economic risks can never be entirely mitigated, the advent of new technology has always been a key driver